INVITATION TO BIDDERS
03-23-30018 Bay St Properties Environmental Remediation
Sealed bids will be received by the Port of Bremerton in its Administration office at 8850 SW State Hwy 3, Bremerton, Washington 98312, until February 26, 2025, at 2:00 PM for construction project entitled, "03-23-30018 Bay Street Properties Environmental Remediation". Any bids received after cannot be considered. The Port is not responsible for courier delays. A public bid opening will take place at the Airport Conference Room following the receipt of bids.
The work to be performed under this contract consists of completing excavation, underground storage tank removal, and in-situ groundwater treatment activities in accordance with Section 5: Remediation Contractor Specifications in the Interim Action Work Plan for 521 and 525 Bay Street in Port Orchard, Washington, prepared by PIONEER Technologies Corporation in May 2024, and incorporated into this solicitation. The construction estimate is $350,000.00.
The building structures at 521 and 525 Bay St. have been removed with utilities disconnected and was solicited separately.
A pre-bid site visit is scheduled for January 29, 2025, at 10:00 AM at the site address of 521-525 Bay. St in Port Orchard, WA 98366.
FULL SOLICITATION DOCUMENTS ARE AVAILABLE FOR DOWNLOAD THROUGH DROPBOX AND CONSISTS OF TWO PDF FILES:
2. ”Complete 521&525 Bay St IAWP_050324_Ecy concurred"
DROPBOX LINK: https://www.dropbox.com/scl/fo/1ujtcjrpo6xjq2j6ltoo0/AHl6Q7cVm4wIKohCzoyICtY?rlkey=qd9kt28hgnt1t4n1td4kfvs3m&st=e41u3wc5&dl=0
PREVAILING WAGE: All contractors and subcontractors performing work on a construction project funded through this Contract shall comply with prevailing wage laws by paying the higher of state or federal prevailing wages according to:
This contract will be funded, in part, by a grant from the Environmental Protection Agency. As such, it will be subject to Federal requirements described throughout the Bidding documents.
The Port of Bremerton, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises (DBE) will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
Each bid shall be accompanied by a cashier's check, money order, or bid bond made payable to the Port of Bremerton, in an amount not less than five percent (5%) of the amount of the base bid. Said check or bid bond shall be given as a guarantee that the bidder shall execute such contract as may be awarded to it in conformity with its bid and with the contract documents, and shall provide surety bonds as specified therein with ten (10) days after notification of the award of contract.
The Port of Bremerton reserves the right to reject any or all bids, and waive irregularities or informalities in the bid or in the bidding.
No bidder may withdraw its bid after the hour set for the opening thereof or before award of contract, unless bid award is delayed for a period exceeding forty-five (45) days.
SCHEDULE:
Issue Invitation to Bid 1/15/2025
Pre-Bid Site Visit 1/29/2025 @ 10:00 AM
Question Deadline 2/5/2025 @ 4:30 PM
Addenda Deadline 2/15/2025 @ 4:30 PM
Bids Due/Bid Opening 2/26/2025 @ 2:00 PM
Commission Award (Anticipated) 3/12/2025
Pre-Construction Meeting (Anticipated) 4/15/2025
Notice to Proceed (Anticipated) 4/28/2025
QUESTIONS:
Questions shall be submitted in writing no later than the question deadline or via e-mail to: James Weaver, Director of Marine Facilities, 8850 SW State Hwy 3, Bremerton, WA 98312, James@portofbremerton.org
With cc to: Michael Kurkov, PIONEER Technologies Corporation, 5205 Corporate Ctr. Ct. SE, Ste. A, Olympia, WA 98503-5901, KurkovM@uspioneer.com
Questions will be complied and responses, if warranted, issued in the form of an addendum. No addenda shall be issued less than three (3) working days prior to the bid due date, or the bid due date will be pushed out at least seven (7) days.
BIDDER RESPONSIBILITY CRITERIA: The contract will be awarded to the party submitting the "lowest responsible proposal," subject to any products and/or vendor preferences provided by applicable Washington State laws, taking into consideration the quality of the articles proposed to be supplied, their conformity with specifications, and the purposes for which required. The Port may reject any and all proposals.
In determining "lowest responsible proposal," in addition to price and other factors outlined above, the following criteria are used in determining the lowest responsible proposal:
Plan Holder Instructions:
Interested bidders may add themselves to the plan holder list for this project by completing the Google form here: https://forms.gle/P1n6h5hnxhXx59QP6
Once you have completed the form and submitted your responses, your responses will populate into the plan holder list available here: https://docs.google.com/spreadsheets/d/1TTVKG1LnOIQGqIsCVRFLp0W4AaPa7uSLcqpXmlDyy-o/edit?usp=sharing
Following the bid due date, the final plan holder list will be uploaded to the Port’s website here.